GreenPlus Medical GreenPlus Medical

Intelligent Environmental Control Veterinary ICU with 10-20 Ventilations/Hour Carbon Light Disinfection

Classification: Physiological Functions of Diagnosis and Monitoring Equipment
Type: Patient Monitor
Certification: CE, FDA, ISO13485

Product Description

Veterinary ICU Environment Control
i

Basic Information

Model NO.IVT680-ICU005
GroupVeterinary
Transport PackageWooden Case for Sea Shipment
Specification1250mm * 1020mm * 685mm
TrademarkIvetwell
OriginChina

Applicable Scenarios

  • Postoperative recovery: Provide a constant temperature and sterile environment to reduce the risk of infection.
  • Critical care: Real-time monitoring of vital signs to provide data support for emergency treatment.
  • Newborn pet breeding: Simulate the mother pet's body temperature to support constant temperature cultivation of premature pets.
Veterinary Intensive care units and oxygen therapy cabins have become the preferred equipment for pet hospitals and high-end clinics due to their intelligent monitoring, precision treatment, and high safety. Their technological innovations have not only improved clinical treatment effects but also promoted the standardized development of the domestic pet medical equipment industry.

Technical Parameters

IVT-PLSK680-ICU005 Cockpit
• Exterior: 1250mm(L) * 1020mm(H) * 685mm(W)
• Interior: 1060mm(L) * 610mm(H) * 620mm(W)
• Mobile Wheel Height: 110mm
• Additional Clearance: Power plug 50mm + Door handle 50mm

Main Product Display

Main Product Details
🛡

One-Stop Professional Service

Quality Control Process
Efficiency: Save 20%+ of your time on vendor coordination.
Cost Saving: Reduce 10-15% of total costs from integrated services.
Quality: 3 rounds of inspection (Raw material - Production - Pre-shipment).
A strictly selected factory network supports OEM/ODM adjustments for your specific market needs, including logo printing and functional adjustments. Logistics are handled by top freight forwarders providing door-to-door service and full documentation.
🏆

Corporate Advantage & Certifications

Corporate Advantage Advantage Icon Certifications
📦

Packaging & Shipping

Packaging Logistics
?

Frequently Asked Questions

1. What is the typical production cycle for these units?
The production cycle depends on the order volume and product type. Generally, production is completed within 7-15 working days after order confirmation.
2. Which delivery terms are available?
We support various international standards including EXW (Factory Delivery), FOB (Free on Board), CFR (Cost and Freight), and CIF. You can select the option that is most cost-effective for your region.
3. What certifications are provided with the equipment?
All equipment comes with CE certification, ISO 9001 quality system certification, third-party calibration certificates (CNAS), and detailed factory inspection reports.
4. Is international technical support available?
Yes, a technical support team is available 24/7. We offer problem-solving solutions quickly through rich testing experience, and if necessary, engineers can provide on-site support in your country.
5. How are consumable or broken parts handled?
Should any parts require replacement, please contact support immediately. We maintain a stock of consumable and spare parts for fast replenishment at a standard charge.
6. What are the standard payment terms?
For amounts less than or equal to 2,000 USD, 100% prepayment is required. For larger orders, a 30% deposit and 70% balance is standard. We also accept letters of credit (L/C) and OA agreements.

Related Products